Add up how long each stage takes, or enter the order and delivery dates. Add your daily usage and safety stock to get the reorder point.
Estimates for planning, not financial, tax or legal advice. Figures use US rules unless the page says otherwise.
How lead time is calculated
Lead time = order processing + production + shipping
or Lead time = delivery date − order date
Reorder point = average daily usage × lead time + safety stock
Lead time is the time from placing an order to having the goods ready to use. The reorder point is the stock level that should trigger the next order, so it arrives before you run out.
Worked example
- A supplier takes 2 days to process an order, 10 days to make it and 5 days to ship it: lead time = 2 + 10 + 5 = 17 days.
- You use 40 units a day and keep 200 units of safety stock: reorder point = 40 × 17 + 200 = 880 units.
- Ordered Monday, March 2, 2026 and delivered Friday, March 20, 2026: that's 18 calendar days, or 14 business days counting Monday to Friday after the order date.
Getting a realistic number
- Use your own history. Average the lead time of the last several orders, and note the longest one too.
- Count usage and lead time in the same kind of day. If you only sell on business days, use business days for both.
- Business days here skip Saturdays and Sundays but not public holidays, so subtract any holidays yourself.
- Include time for receiving and inspection if goods can't be used the day they arrive.
- Need the safety stock figure? Work it out with the safety stock calculator.
Sources
How we checked this
Before every update, this calculator is run in a real browser with these known answers, and it must match all of them:
- 2 + 10 + 5 days: 17-day lead time ✓
- 40 units a day and 200 safety stock: reorder at 880 units ✓
- March 2 to March 20, 2026: 18 calendar days ✓
- Same dates in business days: 14 ✓
- Delivery before the order date is flagged ✓
Last checked October 26, 2026. Spotted something wrong? The math is done in your browser with the formula shown on this page, so you can check any result by hand.
Questions people ask
How do you calculate lead time?
Add the time for each stage: order processing, production and shipping. 2 + 10 + 5 days is a 17-day lead time. Or count the days from order date to delivery date.
How do you calculate the reorder point?
Multiply average daily usage by the lead time in days, then add safety stock. 40 units a day × 17 days + 200 = 880 units.
Should lead time be in calendar or business days?
Use whichever your usage is measured in. If the warehouse ships 7 days a week, use calendar days.
What's the difference between lead time and cycle time?
Lead time is measured from the customer's or buyer's order to delivery. Cycle time usually means how long the work itself takes once it starts.
Do business days include holidays?
This calculator skips only Saturdays and Sundays. Subtract public holidays that fall in the period yourself.