Calcist

Style

Buttons

Spacing

How much to show

Decimal places

Text size

Safety stock calculator

Use the service level method if you know how much daily demand varies, or the max minus average method if you only have your highest and typical figures.

Private: calculated on your device. Nothing you type is sent anywhere.

Estimates for planning, not financial, tax or legal advice. Figures use US rules unless the page says otherwise.

Next: Need the lead time first? Use the lead time calculator. Finding σ from daily sales? Try the standard deviation calculator.

Safety stock formulas

Service level method: safety stock = z × σd × √LT
Max minus average: safety stock = (max daily usage × max lead time) − (average daily usage × average lead time)
Reorder point = average daily demand × average lead time + safety stock

σd is the standard deviation of daily demand and LT is the lead time in days. The variation in demand over the whole lead time grows with the square root of its length, so a 9-day lead time has 3 times the daily variation, not 9 times. z is how many standard deviations of cover you hold. It sets the cycle service level: the chance of not running out before a delivery arrives.

Service levelz
90%1.28
95%1.645
97.5%1.96
98%2.054
99%2.326
99.9%3.09

Worked examples

  • Service level: daily demand averages 40 units with a standard deviation of 8, and lead time is 9 days. At 95%, safety stock = 1.645 × 8 × √9 = 1.645 × 8 × 3 = 39.48, so hold 40 units. Reorder point = 40 × 9 + 40 = 400 units.
  • Max minus average: you've used up to 60 units a day (40 on average), and deliveries have taken up to 12 days (8 on average). Safety stock = 60 × 12 − 40 × 8 = 720 − 320 = 400 units. Reorder point = 40 × 8 + 400 = 720 units.

Which method to use

  • The max minus average method needs no statistics, but it plans for the worst day and the worst delay at once, so it often gives much more stock than you need.
  • The service level method assumes daily demand is roughly normal and the lead time is steady. If deliveries are often late, it will understate what you need.
  • Find σd from 30 or more days of sales with the standard deviation calculator.
  • Safety stock is rounded up to whole units.

Sources

How we checked this

Before every update, this calculator is run in a real browser with these known answers, and it must match all of them:

  • 95%, σ = 8 units, 9-day lead time: 40 units ✓
  • Same: reorder point 400 units ✓
  • 99% service level: 56 units ✓
  • Max minus average: 60 × 12 − 40 × 8 = 400 units ✓
  • Same: reorder point 720 units ✓
  • No demand variation: 0 units ✓
  • Maximum below the average is flagged ✓

Last checked October 26, 2026. Spotted something wrong? The math is done in your browser with the formula shown on this page, so you can check any result by hand.

Add this calculator to your website (free)

Paste this code into any web page. The calculator works on your page, resizes itself, has no ads and no tracking cookies, and nothing your visitors type is sent anywhere. More about embedding.

Questions people ask

What is the safety stock formula?

Safety stock = z × standard deviation of daily demand × √lead time in days. At 95% (z = 1.645), with σ = 8 units and a 9-day lead time, it's 1.645 × 8 × 3 = 39.48, or 40 units.

What is the max minus average method?

Multiply your highest daily usage by your longest lead time, then subtract average daily usage times average lead time. 60 × 12 − 40 × 8 = 400 units.

What z-score is a 95% service level?

About 1.645. 90% is 1.28, 98% is 2.054 and 99% is 2.326.

How is the reorder point related to safety stock?

Reorder point = average demand during the lead time + safety stock. Safety stock is the buffer above what you expect to sell while you wait.

What service level should I choose?

Higher service levels cost more in stock held. Many businesses use 95% for most items and higher levels for the products they can least afford to run out of.

Related calculators